Updating control and supervision system

Case Study
Project objective

The objective of the project is to upgrade the control system of the furnaces that the customer has in its production plant. The project is carried out in two phases. The first phase involves the creation of an Ethernet and Profinet network infrastructure both for communication with the supervisory equipment (SCADA and Trends) and between the PLCs. The second phase would replace the PC and screen where the SCADA resides as well as the existing panels and other equipment.